PlainVisa
2026 data Public-data reference Official source

Wind Turbine and Energy Cables Corp.

A DOL Labor Condition Application record spanning FY2024–2025. Review the filing volume, DOL certification record, and offered-wage context below.

DOL LCA filings
4
DOL-certified
100%
Median offered wage
$64,489

Hasbrouck Heights, NJ NAICS: 333611

Wind Turbine and Energy Cables Corp., by the LCA numbers

U.S. Department of Labor's OFLC discloses 4 Labor Condition Application filings naming Wind Turbine and Energy Cables Corp. from FY2024 through FY2025, drawn directly from DOL's quarterly public disclosure releases. An LCA is the wage-and-working-conditions attestation an employer files with DOL before petitioning USCIS for an H-1B worker: it is a filing record, not a USCIS approval, a job offer, or a confirmed hire, and the count reflects filings, not people, since an employer sponsoring the same role at more than one worksite, or refiling across fiscal years, is counted once per filing. See filing history · Recent LCAs

The verdict

Wind Turbine and Energy Cables Corp. is listed in 4 DOL LCA filings, more filings than 73% of employer filers in this extract. DOL certified 100% of those LCAs; the median listed offered wage is $64,489. This is not a USCIS approval, hiring, or sponsorship ranking.

4
DOL LCA filings, FY2024–FY2025
100%
DOL-certified
$64,489
median offered wage
Top 27%
of employer filers by volume

According to U.S. Department of Labor OFLC LCA disclosure files (FY2024–FY2025). Based in Hasbrouck Heights, NJ.

Saved on this device only, no account, no email. Open saved list Follow this profile's data updates Updates when the published DOL data vintage changes; this is a feed, not an alert service.

Wind Turbine and Energy Cables Corp. vs all U.S. employer filers by LCA volume

Where this employer's disclosed Labor Condition Application count sits among every tracked employer filer (inventory signal, not a sponsorship ranking)

4 40444th of 122824 higher than 82,380 of 122,824 employer filers

Employer filers, banded by disclosed H-1B LCA filing count

Each bar is a band; taller bars hold more employer filers. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source U.S. Department of Labor OFLC · FY2024–FY2025

LCA filing shape · Wind Turbine and Energy Cables Corp.

Derived from this employer's disclosed LCAs on file (FY2024–FY2025), title mix and worksite counties, not national boilerplate. LCA filings do not establish USCIS outcomes or confirmed hiring.

Offered-wage span on file: $41,600$74,506 .

Title concentration

  • Project Manager 2 · 50% · $74,253
  • Procurement Specialist 1 · 25% · $41,600
  • Data Analyst 1 · 25% · $67,850

Worksite counties

  • BERGEN, NJ 3 · 75%
  • SANTA ROSA, FL 1 · 25%

Bergen, NJ worksite concentration

Only 4 LCAs on file for Wind Turbine and Energy Cables Corp., and 75% land in BERGEN, NJ. Treat rates as descriptive of a small sample. DOL cert on file: 100%.

Certification Rate

100%

Very high DOL cert

Avg. Salary

$64,489

Below portal avg

Total Workers

4

Small worker count

Wage vs. DOL Minimum

+1.8%

At/above DOL floor

national avg +17.8%

Typical DOL Wage Level

Entry (Level I)

100% of LCA filings

Full-Time Positions

100%

Primary Worksite County

BERGEN, NJ

75% of LCA filings

Recent LCA Filings

Latest H-1B labor condition applications filed by Wind Turbine and Energy Cables Corp.

Job Title Location Salary Status Year
Project Manager Hasbrouck Heights, NJ $74,506 Certified FY2025
Data Analyst Hasbrouck Heights, NJ $67,850 Certified FY2025
Procurement Specialist Milton, FL $41,600 Certified FY2025
Project Manager Hasbrouck Heights, NJ $74,000 Certified FY2024

Nationwide peers near Wind Turbine and Energy Cables Corp.'s 4-LCA band

Cross-state DOL neighbors for Wind Turbine and Energy Cables Corp. - LCA filing-count and offered-wage axes, outside NJ.

Disclaimer: Informational only, not professional advice.

Read with Wind Turbine and Energy Cables Corp.

ABS(total_petitions) peers first, then a LARGEST-distance pole and a stamp-branched drill, not a fixed Related strip. This page stamps TRACE-BOOK · CERT-LOCK · WAGE-BELOW.

What to do with this profile

Use the DOL LCA record for Wind Turbine and Energy Cables Corp. to compare filing volume and offered wages, not USCIS outcomes.

DOL disclosure data only. Not legal advice, sponsorship guarantees, or visa eligibility.

Every figure on PlainVisa is rendered directly from federal source data, no number is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, the data changelog, or report a data error. Data current as of 2026-09-09.